Core Design Team
Firm: LMN Architects
Clay Anderson
David Backs
Greg Bishop, AIA
Elizabeth Correa, AIA
Aubrey Davidson, AIA
Matthew Fisher, AIA
Howard Fitzpatrick, AIA
Cody Gabaldon
Apoorv Goyal
Mette Greenshields, AIA
Chelsea Holman
Euiseok Jeong, AIA
Gustavo Lopez, AIA
Graham Moore, Associate AIA
Lori Naig, IIDA
Walt Niehoff, AIA
Christopher Patterson, AIA
John Petterson, AIA
Bennett Sapin, AIA
Tyler Schaffer, AIA
Todd Schwisow, AIA
Kathy Stallings, AIA
John Woloszyn, AIA
Rushyan Yen, AIA
Consultants/Collaborators
Prime Consultant; Project Manager, Structural, Civil, and Bridge Engineer: KPFF Consulting Engineers
Civil and Electrical Engineer: Jacobs Engineering
Stormwater Engineer: CM Design Group
Landscape Architect: HBB Landscape Architecture
Lighting Design: Dark Light Design
Mechanical/Plumbing Engineer: FSi Consulting Engineers
Electrical Engineer: Jacobs Engineering Group
Communications: Ergosync Engineering
Vertical Transportation: The Greenbusch Group, Inc.
Geotechnical Engineer: Hart Crowser
Signage Design: Ilium
Security Design: Washington State Ferries
General Contractors:
IMCO General Construction (Buildings and Sitework)
Manson Construction Company (Marine Construction)
Orion Marine Group (Marine Construction)
Pacific Pile & Marine (Fuel Pier and Navigation Channel)
Project Narrative
The cultural significance of the Mukilteo Multimodal Ferry Terminal transcends its function as a critical piece of transit infrastructure. The project is located on the site where the 1855 Point Elliott Treaty was signed, guaranteeing perpetual hunting and fishing rights to the tribes on their ancestral lands. The project illustrates how sensitive placemaking, inclusive engagement, and environmental awareness can redefine civic architecture. The terminal, Washington stateās first new ferry terminal in 40 years, incorporates the cultural influence of the Pacific Northwestās native people and includes sustainable elements that demonstrate the stateās commitment to environmental stewardship consistent with the native ethic to ālive light on the earthā.
The Ferry Terminal is the West Coastās busiest ferry route for vehicles, which moves more than two million vehicles and nearly four million riders annually in conjunction with State Route 525, the major transportation corridor connecting Whidbey Island to the Seattle-Everett metropolitan area. With proximity to commuter trains via the Mukilteo Sounder Station, the terminalās walk-on ridership is expected to increase over 100 percent in the next 20 years. The new facility provides space for vehicle holding and separates pedestrian and vehicle boarding with an overhead walkway for safe, efficient accessible loading.
The buildingās longhouse form, derived through close collaboration with Coast Salish Tribes, enriches the passenger experience, streamlining circulation and managing large patron flows with intuitive wayfinding. The waiting room is a daylight-filled space with views to land and sea that help orient ferry riders.
Tribal cultural artworks created by local Native American artists Kate Ahvakana, Joe Gobin, and James Madison are displayed throughout the terminal, creating a strong connection to the tribal community and history. A new waterfront promenade connects a path from downtown, through the terminal and onto the beach, creating an elevated pathway for public use.
The Firm worked closely with several Coast Salish Tribes to incorporate environmental stewardship into the concept. The projectās strong sustainability ambitions started with repurposing the brownfield site, which previously housed a U.S. Air Force Cold War fuel depot and pier. The terminal building combines advanced energy and water conservation, and the longhouse-style shed roof allows for a full array of photovoltaic panels, which supply 40% of the terminalās electrical demand. Efficient heating of the concretes lab main floor with electric heat pumps provides interior comfort in the winter, while in the warmer months a thermostatically controlled rack and pinion window system optimizes airflow and comfort. The vehicle holding area features pervious concrete that allows stormwater to filter through layers of sand before entering Possession Sound.
The project significantly improves regional mobility while incorporating the cultural influence of the community and paying homage to the siteās historic roots. The ferry terminal demonstrates a sustainable approach and has become a new model for how local, state, and tribal governments can work together. The project represents what is possible when the community and a multidisciplinary team collaborate in support of a shared vision.